US Class I Rail Process Wiki Safety & Regulatory Compliance › FRA Inspection and Enforcement Liaison
🗺 BPMN Process Flow
RR-07-05-02 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-07-05-02
Domain FamilyCORPORATE
L1 DomainSafety & Regulatory Compliance
L2 Process GroupFRA Inspection and Enforcement Liaison
TriggerInitiation of an FRA inspection or receipt of a notification from the Surface Transportation Board (STB) regarding potential non-compliance.
OutcomeSuccessful completion ensures that all identified issues are addressed, corrective actions are taken, and compliance with federal regulations is maintained.
SystemsNetControl I-ETMS Umler C3RS EHMS
Regulatory Hooks49 CFR Part 232 GCOR
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Receive FRA Inspection Notification Chief Safety Officer / VP Safety NetControl FRA inspection notification Inspection schedule update Time to respond to FRA notification < 24 hours Delayed response due to system integration issues N Y
1.2 Coordinate Inspection Team Train Dispatcher I-ETMS Inspection schedule update Inspection team deployment plan Team deployment within 4 hours of notification Inadequate resources for inspection N Y
1.3 Conduct Initial Inspection Car Inspector (Carman) Umler Inspection team deployment plan Initial inspection report Completion of initial inspection within 8 hours Inconsistent reporting formats Y N
1.4 Review Inspection Report Rules Officer C3RS Initial inspection report Inspection findings and recommendations Time to review report < 2 hours Complexity in interpreting regulatory requirements Y N
1.5 Develop Corrective Actions Plan Chief Dispatcher NetControl Inspection findings and recommendations Corrective actions plan Plan development within 24 hours of report review Resource allocation conflicts Y N
1.6 Implement Corrective Actions Locomotive Engineer EHMS Corrective actions plan Action completion status report Completion of corrective actions within 7 days Equipment downtime affecting operations Y N
1.7 Verify Corrective Actions Switchman/Switch Foreman I-ETMS Action completion status report Verification report Verification within 24 hours of action completion Inconsistent verification protocols Y N
1.8 Report to FRA Chief Safety Officer / VP Safety NetControl Verification report FRA compliance report Time to submit report < 48 hours after verification Data entry errors in reporting system N Y
1.9 Monitor Compliance Post-Inspection Train Dispatcher I-ETMS FRA compliance report Compliance monitoring report Continuous monitoring for 30 days post-inspection Lack of real-time data integration Y N
1.10 Update Safety Policies and Procedures Rules Instructor / Rules Officer Umler Compliance monitoring report Updated safety policies and procedures Policy update within 60 days of final compliance report Resistance to change in operational practices Y N
1.11 Review and Improve Processes VP Network Planning & Operations NetControl Updated safety policies and procedures Process improvement plan Process review cycle < 90 days Resource constraints for process improvements Y N
1.12 Implement Process Improvements Service Design / Network Planning Analyst I-ETMS Process improvement plan Implementation status report Improvement implementation within 6 months of review Coordination challenges across departments Y N
📊 KPIs & Risk Register

KPIs

Time to respond to FRA notification < 24 hours Team deployment within 4 hours of notification Completion of initial inspection within 8 hours Time to review report < 2 hours Plan development within 24 hours of report review Completion of corrective actions within 7 days Verification within 24 hours of action completion Time to submit report < 48 hours after verification Continuous monitoring for 30 days post-inspection Policy update within 60 days of final compliance report Process review cycle < 90 days Improvement implementation within 6 months of review

Key Risks

Inadequate resources for inspection Complexity in interpreting regulatory requirements Resource allocation conflicts Equipment downtime affecting operations Lack of real-time data integration Resistance to change in operational practices Resource constraints for process improvements Coordination challenges across departments

Swim Lanes

Chief Safety Officer / VP Safety · 1.1, 1.8, 1.10 Train Dispatcher · 1.2, 1.9, 1.11 Car Inspector (Carman) · 1.3 Rules Officer · 1.4 Chief Dispatcher · 1.5 Locomotive Engineer · 1.6 Switchman/Switch Foreman · 1.7 Rules Instructor / Rules Officer · 1.10 VP Network Planning & Operations · 1.11 Service Design / Network Planning Analyst · 1.12