RR-07 RR-07-05-02 — FRA Inspection and Enforcement Liaison
This process involves the coordination between the FRA Inspection and Enforcement Liaison team and various railroad departments to ensure compliance with federal regulations and industry standards during inspections. It includes reporting, tracking, and addressing issues identified during inspections.
🗺 BPMN Process Flow
Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG
📋 Process Attributes
| Process ID | RR-07-05-02 |
|---|---|
| Domain Family | CORPORATE |
| L1 Domain | Safety & Regulatory Compliance |
| L2 Process Group | FRA Inspection and Enforcement Liaison |
| Trigger | Initiation of an FRA inspection or receipt of a notification from the Surface Transportation Board (STB) regarding potential non-compliance. |
| Outcome | Successful completion ensures that all identified issues are addressed, corrective actions are taken, and compliance with federal regulations is maintained. |
| Systems | NetControl I-ETMS Umler C3RS EHMS |
| Regulatory Hooks | 49 CFR Part 232 GCOR |
📋 L4 Process Steps
| Step | Name | Role | System | Input | Output | KPI | Pain Point / Risk | Decision? | Exception? |
|---|---|---|---|---|---|---|---|---|---|
| 1.1 | Receive FRA Inspection Notification | Chief Safety Officer / VP Safety | NetControl | FRA inspection notification | Inspection schedule update | Time to respond to FRA notification < 24 hours | Delayed response due to system integration issues | N | Y |
| 1.2 | Coordinate Inspection Team | Train Dispatcher | I-ETMS | Inspection schedule update | Inspection team deployment plan | Team deployment within 4 hours of notification | Inadequate resources for inspection | N | Y |
| 1.3 | Conduct Initial Inspection | Car Inspector (Carman) | Umler | Inspection team deployment plan | Initial inspection report | Completion of initial inspection within 8 hours | Inconsistent reporting formats | Y | N |
| 1.4 | Review Inspection Report | Rules Officer | C3RS | Initial inspection report | Inspection findings and recommendations | Time to review report < 2 hours | Complexity in interpreting regulatory requirements | Y | N |
| 1.5 | Develop Corrective Actions Plan | Chief Dispatcher | NetControl | Inspection findings and recommendations | Corrective actions plan | Plan development within 24 hours of report review | Resource allocation conflicts | Y | N |
| 1.6 | Implement Corrective Actions | Locomotive Engineer | EHMS | Corrective actions plan | Action completion status report | Completion of corrective actions within 7 days | Equipment downtime affecting operations | Y | N |
| 1.7 | Verify Corrective Actions | Switchman/Switch Foreman | I-ETMS | Action completion status report | Verification report | Verification within 24 hours of action completion | Inconsistent verification protocols | Y | N |
| 1.8 | Report to FRA | Chief Safety Officer / VP Safety | NetControl | Verification report | FRA compliance report | Time to submit report < 48 hours after verification | Data entry errors in reporting system | N | Y |
| 1.9 | Monitor Compliance Post-Inspection | Train Dispatcher | I-ETMS | FRA compliance report | Compliance monitoring report | Continuous monitoring for 30 days post-inspection | Lack of real-time data integration | Y | N |
| 1.10 | Update Safety Policies and Procedures | Rules Instructor / Rules Officer | Umler | Compliance monitoring report | Updated safety policies and procedures | Policy update within 60 days of final compliance report | Resistance to change in operational practices | Y | N |
| 1.11 | Review and Improve Processes | VP Network Planning & Operations | NetControl | Updated safety policies and procedures | Process improvement plan | Process review cycle < 90 days | Resource constraints for process improvements | Y | N |
| 1.12 | Implement Process Improvements | Service Design / Network Planning Analyst | I-ETMS | Process improvement plan | Implementation status report | Improvement implementation within 6 months of review | Coordination challenges across departments | Y | N |
📊 KPIs & Risk Register
KPIs
Time to respond to FRA notification < 24 hours Team deployment within 4 hours of notification Completion of initial inspection within 8 hours Time to review report < 2 hours Plan development within 24 hours of report review Completion of corrective actions within 7 days Verification within 24 hours of action completion Time to submit report < 48 hours after verification Continuous monitoring for 30 days post-inspection Policy update within 60 days of final compliance report Process review cycle < 90 days Improvement implementation within 6 months of review
Key Risks
Inadequate resources for inspection Complexity in interpreting regulatory requirements Resource allocation conflicts Equipment downtime affecting operations Lack of real-time data integration Resistance to change in operational practices Resource constraints for process improvements Coordination challenges across departments
Swim Lanes
Chief Safety Officer / VP Safety · 1.1, 1.8, 1.10 Train Dispatcher · 1.2, 1.9, 1.11 Car Inspector (Carman) · 1.3 Rules Officer · 1.4 Chief Dispatcher · 1.5 Locomotive Engineer · 1.6 Switchman/Switch Foreman · 1.7 Rules Instructor / Rules Officer · 1.10 VP Network Planning & Operations · 1.11 Service Design / Network Planning Analyst · 1.12