US Class I Rail Process Wiki Engineering: Track, Structures & Signals › Maintenance-of-Way Programs (rail, tie, surfacing gangs)
🗺 BPMN Process Flow
RR-06-03-02 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-06-03-02
Domain FamilyOPERATIONS
L1 DomainEngineering: Track, Structures & Signals
L2 Process GroupMaintenance-of-Way Programs (rail, tie, surfacing gangs)
TriggerScheduled maintenance plan or detection of track defects through automated inspection systems
OutcomeSafe and compliant railway infrastructure with minimal disruptions to service
SystemsNetControl I-ETMS Wabtrax FRA Automated Track Inspection Program RailAI Umler PS Technology TRAIN II EHMS
Regulatory Hooks49 CFR Part 236 49 CFR Part 213 GCOR
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Track Inspection Planning Track Supervisor I-ETMS Maintenance schedule, track geometry data Inspection plan Number of tracks inspected per day Inaccurate inspection plans leading to missed defects N N
1.2 Automated Track Inspection Track Supervisor Wabtrax, FRA Automated Track Inspection Program Inspection plan Defect report Detection rate of critical defects False positives or negatives in defect detection N Y
1.3 Manual Track Inspection Assistant Foreman (track) NetControl, RailAI Defect report Detailed inspection report Time taken for manual inspections Inconsistent inspection quality N Y
1.4 Defect Prioritization Track Supervisor I-ETMS, Umler Detailed inspection report Prioritized defect list Time to prioritize defects Overlooking critical defects Y N
1.5 Work Order Creation Track Supervisor NetControl, TRAIN II Prioritized defect list Work order Time to create work orders Inaccurate or incomplete work orders N Y
1.6 Maintenance Crew Assignment Track Supervisor PS Technology, CrewPro Work order Crew assignment Time to assign crews Inefficient crew utilization N Y
1.7 Maintenance Execution Roadmaster NetControl, RailAI Crew assignment Maintenance report Time to complete maintenance tasks Safety hazards during maintenance Y N
1.8 Post-Maintenance Inspection Assistant Foreman (track) NetControl, RailAI Maintenance report Inspection report Time to complete post-maintenance inspections Inconsistent inspection quality N Y
1.9 Defect Closure Track Supervisor I-ETMS, Umler Inspection report Defect closure record Time to close defects Overlooking reopened defects Y N
1.10 Maintenance Documentation Track Supervisor NetControl, TRAIN II Defect closure record Maintenance log Accuracy of maintenance logs Inaccurate documentation leading to compliance issues N Y
1.11 Regulatory Compliance Review Chief Engineer / VP Engineering NetControl, EHMS Maintenance log Compliance report Time to review compliance Non-compliance with regulatory standards Y N
1.12 Continuous Improvement Track Supervisor NetControl, RailAI Compliance report Improvement plan Number of process improvements implemented Resistance to change in maintenance practices Y N
📊 KPIs & Risk Register

KPIs

Number of tracks inspected per day Detection rate of critical defects Time taken for manual inspections Time to prioritize defects Time to create work orders Time to assign crews Time to complete maintenance tasks Time to complete post-maintenance inspections Time to close defects Accuracy of maintenance logs Time to review compliance Number of process improvements implemented

Key Risks

Safety hazards during maintenance Non-compliance with regulatory standards Resistance to change in maintenance practices Inaccurate documentation leading to compliance issues Overlooking reopened defects

Swim Lanes

Track Supervisor · 1.1, 1.4, 1.5, 1.9, 1.10, 1.12 Assistant Foreman (track) · 1.2, 1.3, 1.8 Roadmaster · 1.6, 1.7