RR-06 RR-06-03-02 — Maintenance-of-Way Programs (rail, tie, surfacing gangs)
This process outlines the maintenance-of-way programs for rail, tie, and surfacing gangs in a US Class I freight railroad. It ensures that tracks are inspected, maintained, and repaired to meet safety standards and regulatory requirements.
🗺 BPMN Process Flow
Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG
📋 Process Attributes
| Process ID | RR-06-03-02 |
|---|---|
| Domain Family | OPERATIONS |
| L1 Domain | Engineering: Track, Structures & Signals |
| L2 Process Group | Maintenance-of-Way Programs (rail, tie, surfacing gangs) |
| Trigger | Scheduled maintenance plan or detection of track defects through automated inspection systems |
| Outcome | Safe and compliant railway infrastructure with minimal disruptions to service |
| Systems | NetControl I-ETMS Wabtrax FRA Automated Track Inspection Program RailAI Umler PS Technology TRAIN II EHMS |
| Regulatory Hooks | 49 CFR Part 236 49 CFR Part 213 GCOR |
📋 L4 Process Steps
| Step | Name | Role | System | Input | Output | KPI | Pain Point / Risk | Decision? | Exception? |
|---|---|---|---|---|---|---|---|---|---|
| 1.1 | Track Inspection Planning | Track Supervisor | I-ETMS | Maintenance schedule, track geometry data | Inspection plan | Number of tracks inspected per day | Inaccurate inspection plans leading to missed defects | N | N |
| 1.2 | Automated Track Inspection | Track Supervisor | Wabtrax, FRA Automated Track Inspection Program | Inspection plan | Defect report | Detection rate of critical defects | False positives or negatives in defect detection | N | Y |
| 1.3 | Manual Track Inspection | Assistant Foreman (track) | NetControl, RailAI | Defect report | Detailed inspection report | Time taken for manual inspections | Inconsistent inspection quality | N | Y |
| 1.4 | Defect Prioritization | Track Supervisor | I-ETMS, Umler | Detailed inspection report | Prioritized defect list | Time to prioritize defects | Overlooking critical defects | Y | N |
| 1.5 | Work Order Creation | Track Supervisor | NetControl, TRAIN II | Prioritized defect list | Work order | Time to create work orders | Inaccurate or incomplete work orders | N | Y |
| 1.6 | Maintenance Crew Assignment | Track Supervisor | PS Technology, CrewPro | Work order | Crew assignment | Time to assign crews | Inefficient crew utilization | N | Y |
| 1.7 | Maintenance Execution | Roadmaster | NetControl, RailAI | Crew assignment | Maintenance report | Time to complete maintenance tasks | Safety hazards during maintenance | Y | N |
| 1.8 | Post-Maintenance Inspection | Assistant Foreman (track) | NetControl, RailAI | Maintenance report | Inspection report | Time to complete post-maintenance inspections | Inconsistent inspection quality | N | Y |
| 1.9 | Defect Closure | Track Supervisor | I-ETMS, Umler | Inspection report | Defect closure record | Time to close defects | Overlooking reopened defects | Y | N |
| 1.10 | Maintenance Documentation | Track Supervisor | NetControl, TRAIN II | Defect closure record | Maintenance log | Accuracy of maintenance logs | Inaccurate documentation leading to compliance issues | N | Y |
| 1.11 | Regulatory Compliance Review | Chief Engineer / VP Engineering | NetControl, EHMS | Maintenance log | Compliance report | Time to review compliance | Non-compliance with regulatory standards | Y | N |
| 1.12 | Continuous Improvement | Track Supervisor | NetControl, RailAI | Compliance report | Improvement plan | Number of process improvements implemented | Resistance to change in maintenance practices | Y | N |
📊 KPIs & Risk Register
KPIs
Number of tracks inspected per day Detection rate of critical defects Time taken for manual inspections Time to prioritize defects Time to create work orders Time to assign crews Time to complete maintenance tasks Time to complete post-maintenance inspections Time to close defects Accuracy of maintenance logs Time to review compliance Number of process improvements implemented
Key Risks
Safety hazards during maintenance Non-compliance with regulatory standards Resistance to change in maintenance practices Inaccurate documentation leading to compliance issues Overlooking reopened defects
Swim Lanes
Track Supervisor · 1.1, 1.4, 1.5, 1.9, 1.10, 1.12 Assistant Foreman (track) · 1.2, 1.3, 1.8 Roadmaster · 1.6, 1.7