RR-02 RR-02-08-02 — Emergency & Derailment Dispatch Response
This process outlines the emergency and derailment dispatch response for a US Class I freight railroad, focusing on immediate actions to ensure safety, secure the scene, and initiate recovery operations.
🗺 BPMN Process Flow
Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG
📋 Process Attributes
| Process ID | RR-02-08-02 |
|---|---|
| Domain Family | NETWORK & PLANNING |
| L1 Domain | Dispatching & Train Movement |
| L2 Process Group | Emergency & Derailment Dispatch Response |
| Trigger | Detection of an emergency or derailment by wayside defect detectors, machine vision portals, or direct reports from train crew members. |
| Outcome | A safe and orderly response to the emergency, ensuring no further incidents occur, securing the derailment site, and initiating recovery and repair operations. |
| Systems | NetControl CADx Umler EHMS |
| Regulatory Hooks | 49 CFR Part 232 GCOR 6.28 |
📋 L4 Process Steps
| Step | Name | Role | System | Input | Output | KPI | Pain Point / Risk | Decision? | Exception? |
|---|---|---|---|---|---|---|---|---|---|
| 1.1 | Receive Notification | Train Dispatcher | NetControl / CADx | Derailment notification from wayside defect detector or crew report | Dispatch order to nearest emergency response team | Response time under 10 minutes | Delayed notification due to system failure | Y | N |
| 1.2 | Initiate Emergency Response | Chief Dispatcher | NetControl / CADx | Dispatch order from Train Dispatcher | Emergency response team dispatched | Response team on scene within 30 minutes | Inadequate resources for immediate response | N | Y |
| 1.3 | Secure the Scene | Control Operator | NetControl / CADx | Emergency team report | Scene secured and blocked off | Scene secured within 60 minutes | Difficulty in securing the scene due to weather conditions | Y | N |
| 1.4 | Coordinate with Emergency Services | Train Dispatcher | NetControl / CADx | Emergency team report | Coordination with local emergency services | Coordination completed within 15 minutes | Communication breakdown between railroad and emergency services | N | Y |
| 1.5 | Assess Damage | Car Inspector (Carman) | Umler / EHMS | Scene secured report | Damage assessment report | Damage assessment completed within 2 hours | Inaccurate damage assessment due to limited visibility | Y | N |
| 1.6 | Plan Recovery Operations | VP Network Planning & Operations | NetControl / CADx | Damage assessment report | Recovery operation plan | Recovery plan finalized within 4 hours | Resource allocation conflicts with other operations | N | Y |
| 1.7 | Implement Recovery Operations | Train Dispatcher | NetControl / CADx | Recovery operation plan | Recovery operations initiated | Operations started within 1 hour of plan approval | Logistical challenges in executing recovery plan | Y | N |
| 1.8 | Monitor Recovery Progress | Control Operator | NetControl / CADx | Recovery operations status | Progress report to Chief Dispatcher | Progress updates every 30 minutes | Inconsistent progress reporting | N | Y |
| 1.9 | Evaluate and Adjust Recovery Plan | Chief Dispatcher | NetControl / CADx | Progress report | Adjusted recovery plan if necessary | Plan adjustments made within 2 hours of initial evaluation | Difficulty in adjusting plans due to unforeseen issues | Y | N |
| 1.10 | Complete Recovery Operations | Train Dispatcher | NetControl / CADx | Final progress report | Recovery operations completed and site cleared | Operations completed within 24 hours of initial notification | Prolonged recovery due to extensive damage | N | Y |
| 1.11 | Conduct Post-Event Review | Service Design / Network Planning Analyst | NetControl / CADx | Recovery operations report | Post-event review report | Review completed within 7 days of event resolution | Insufficient data for comprehensive review | Y | N |
| 1.12 | Update Safety Protocols | VP Network Planning & Operations | NetControl / CADx | Post-event review report | Updated safety protocols | Protocols updated within 30 days of event resolution | Resistance to protocol changes from operational teams | N | Y |
📊 KPIs & Risk Register
KPIs
Response time under 10 minutes Scene secured within 60 minutes Coordination completed within 15 minutes Damage assessment completed within 2 hours Recovery plan finalized within 4 hours Operations started within 1 hour of plan approval Progress updates every 30 minutes Plan adjustments made within 2 hours of initial evaluation Operations completed within 24 hours of initial notification Review completed within 7 days of event resolution Protocols updated within 30 days of event resolution
Key Risks
Inadequate resources for immediate response Difficulty in securing the scene due to weather conditions Communication breakdown between railroad and emergency services Resource allocation conflicts with other operations Logistical challenges in executing recovery plan Prolonged recovery due to extensive damage Insufficient data for comprehensive review Resistance to protocol changes from operational teams
Swim Lanes
Train Dispatcher · 1.1, 1.4, 1.6, 1.7, 1.9, 1.10 Chief Dispatcher · 1.2, 1.3, 1.8, 1.11, 1.12 Control Operator · 1.5, 1.10 Car Inspector (Carman) · 1.9