RR-06 RR-06-04-03 — Track Authority and Roadway Worker Protection
This process ensures the safe and efficient operation of track authority and roadway worker protection for a US Class I freight railroad. It involves monitoring track conditions, managing work zones, and ensuring compliance with regulatory requirements.
🗺 BPMN Process Flow
Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG
📋 Process Attributes
| Process ID | RR-06-04-03 |
|---|---|
| Domain Family | OPERATIONS |
| L1 Domain | Engineering: Track, Structures & Signals |
| L2 Process Group | Track Authority and Roadway Worker Protection |
| Trigger | Detection of potential track defects or notification of planned maintenance activities |
| Outcome | Safe passage of trains through the affected area with minimal disruption to operations |
| Systems | NetControl I-ETMS Wabtrax FRA Automated Track Inspection Program (ATIP) UP automated/autonomous track inspection program Umler PS Technology EHMS CHARM |
| Regulatory Hooks | 49 CFR Part 213 49 CFR Part 236, Subpart I 49 CFR Part 234 49 CFR Part 1180 |
📋 L4 Process Steps
| Step | Name | Role | System | Input | Output | KPI | Pain Point / Risk | Decision? | Exception? |
|---|---|---|---|---|---|---|---|---|---|
| 1.1 | Track Condition Monitoring | Track Supervisor | Wabtrax, FRA Automated Track Inspection Program (ATIP), UP automated/autonomous track inspection program | Track geometry data, defect reports | Track condition report | Defect detection rate above 95% | Inaccurate or delayed track condition reporting | N | Y |
| 1.2 | Work Zone Notification | Roadmaster | I-ETMS, NetControl | Track condition report | Work zone notification to train dispatchers and crew members | Notification accuracy rate above 98% | Missed or incorrect notifications leading to safety incidents | Y | N |
| 1.3 | Train Speed Reduction | Train Dispatcher | I-ETMS, PTC Back Office Server (BOS) | Work zone notification | Speed restriction order | Average train speed reduction in work zones below 20 mph | Non-compliance with speed restrictions | Y | N |
| 1.4 | Crew Training and Briefing | Assistant Foreman (track) | PS Technology, EHMS | Speed restriction order | Training log | Crew training completion rate above 90% | Inadequate crew training leading to operational errors | N | Y |
| 1.5 | Track Maintenance Planning | Chief Engineer / VP Engineering | Umler, CHARM | Track condition report | Maintenance plan | Maintenance plan adherence rate above 85% | Delayed or incomplete maintenance activities | Y | N |
| 1.6 | Work Zone Setup | Roadmaster | NetControl, I-ETMS | Maintenance plan | Work zone setup confirmation | Work zone setup accuracy rate above 95% | Incorrect work zone setups causing disruptions | N | Y |
| 1.7 | Track Inspection During Maintenance | Signal Maintainer | Wabtrax, RailAI (Tetra Tech) | Work zone setup confirmation | Inspection report | Inspection coverage rate above 90% | Omissions in track inspection during maintenance | Y | N |
| 1.8 | Post-Maintenance Review | Track Supervisor | Umler, CHARM | Inspection report | Review summary | Post-maintenance review completion rate above 95% | Inadequate post-maintenance reviews leading to undetected issues | N | Y |
| 1.9 | Work Zone Removal | Roadmaster | NetControl, I-ETMS | Review summary | Work zone removal confirmation | Work zone removal accuracy rate above 98% | Delayed or incorrect work zone removals causing safety hazards | Y | N |
| 1.10 | Speed Restriction Removal | Train Dispatcher | I-ETMS, PTC Back Office Server (BOS) | Work zone removal confirmation | Speed restriction removal order | Average train speed recovery time below 30 minutes | Extended train delays due to slow speed restriction removal | Y | N |
| 1.11 | Post-Operation Review | Chief Engineer / VP Engineering | Umler, CHARM | Speed restriction removal order | Operational review report | Operational review completion rate above 90% | Inadequate post-operation reviews leading to recurring issues | N | Y |
| 1.12 | Continuous Improvement Planning | Service Design / Network Planning Analyst | NetControl, Umler | Operational review report | Improvement plan | Improvement plan implementation rate above 80% | Non-implementation of improvement plans leading to persistent problems | Y | N |
📊 KPIs & Risk Register
KPIs
Defect detection rate above 95% Notification accuracy rate above 98% Average train speed reduction in work zones below 20 mph Crew training completion rate above 90% Maintenance plan adherence rate above 85% Work zone setup accuracy rate above 95% Inspection coverage rate above 90% Post-maintenance review completion rate above 95% Work zone removal accuracy rate above 98% Average train speed recovery time below 30 minutes Operational review completion rate above 90% Improvement plan implementation rate above 80%
Key Risks
Air brake test defect released to the road Non-compliance with speed restrictions Inadequate crew training leading to operational errors Delayed or incomplete maintenance activities Incorrect work zone setups causing disruptions
Swim Lanes
Track Supervisor · 1.1, 1.8 Roadmaster · 1.2, 1.6, 1.9 Train Dispatcher · 1.3, 1.10 Assistant Foreman (track) · 1.4 Chief Engineer / VP Engineering · 1.5, 1.11, 1.12