US Class I Rail Process Wiki Engineering: Track, Structures & Signals › Track Authority and Roadway Worker Protection
🗺 BPMN Process Flow
RR-06-04-03 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-06-04-03
Domain FamilyOPERATIONS
L1 DomainEngineering: Track, Structures & Signals
L2 Process GroupTrack Authority and Roadway Worker Protection
TriggerDetection of potential track defects or notification of planned maintenance activities
OutcomeSafe passage of trains through the affected area with minimal disruption to operations
SystemsNetControl I-ETMS Wabtrax FRA Automated Track Inspection Program (ATIP) UP automated/autonomous track inspection program Umler PS Technology EHMS CHARM
Regulatory Hooks49 CFR Part 213 49 CFR Part 236, Subpart I 49 CFR Part 234 49 CFR Part 1180
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Track Condition Monitoring Track Supervisor Wabtrax, FRA Automated Track Inspection Program (ATIP), UP automated/autonomous track inspection program Track geometry data, defect reports Track condition report Defect detection rate above 95% Inaccurate or delayed track condition reporting N Y
1.2 Work Zone Notification Roadmaster I-ETMS, NetControl Track condition report Work zone notification to train dispatchers and crew members Notification accuracy rate above 98% Missed or incorrect notifications leading to safety incidents Y N
1.3 Train Speed Reduction Train Dispatcher I-ETMS, PTC Back Office Server (BOS) Work zone notification Speed restriction order Average train speed reduction in work zones below 20 mph Non-compliance with speed restrictions Y N
1.4 Crew Training and Briefing Assistant Foreman (track) PS Technology, EHMS Speed restriction order Training log Crew training completion rate above 90% Inadequate crew training leading to operational errors N Y
1.5 Track Maintenance Planning Chief Engineer / VP Engineering Umler, CHARM Track condition report Maintenance plan Maintenance plan adherence rate above 85% Delayed or incomplete maintenance activities Y N
1.6 Work Zone Setup Roadmaster NetControl, I-ETMS Maintenance plan Work zone setup confirmation Work zone setup accuracy rate above 95% Incorrect work zone setups causing disruptions N Y
1.7 Track Inspection During Maintenance Signal Maintainer Wabtrax, RailAI (Tetra Tech) Work zone setup confirmation Inspection report Inspection coverage rate above 90% Omissions in track inspection during maintenance Y N
1.8 Post-Maintenance Review Track Supervisor Umler, CHARM Inspection report Review summary Post-maintenance review completion rate above 95% Inadequate post-maintenance reviews leading to undetected issues N Y
1.9 Work Zone Removal Roadmaster NetControl, I-ETMS Review summary Work zone removal confirmation Work zone removal accuracy rate above 98% Delayed or incorrect work zone removals causing safety hazards Y N
1.10 Speed Restriction Removal Train Dispatcher I-ETMS, PTC Back Office Server (BOS) Work zone removal confirmation Speed restriction removal order Average train speed recovery time below 30 minutes Extended train delays due to slow speed restriction removal Y N
1.11 Post-Operation Review Chief Engineer / VP Engineering Umler, CHARM Speed restriction removal order Operational review report Operational review completion rate above 90% Inadequate post-operation reviews leading to recurring issues N Y
1.12 Continuous Improvement Planning Service Design / Network Planning Analyst NetControl, Umler Operational review report Improvement plan Improvement plan implementation rate above 80% Non-implementation of improvement plans leading to persistent problems Y N
📊 KPIs & Risk Register

KPIs

Defect detection rate above 95% Notification accuracy rate above 98% Average train speed reduction in work zones below 20 mph Crew training completion rate above 90% Maintenance plan adherence rate above 85% Work zone setup accuracy rate above 95% Inspection coverage rate above 90% Post-maintenance review completion rate above 95% Work zone removal accuracy rate above 98% Average train speed recovery time below 30 minutes Operational review completion rate above 90% Improvement plan implementation rate above 80%

Key Risks

Air brake test defect released to the road Non-compliance with speed restrictions Inadequate crew training leading to operational errors Delayed or incomplete maintenance activities Incorrect work zone setups causing disruptions

Swim Lanes

Track Supervisor · 1.1, 1.8 Roadmaster · 1.2, 1.6, 1.9 Train Dispatcher · 1.3, 1.10 Assistant Foreman (track) · 1.4 Chief Engineer / VP Engineering · 1.5, 1.11, 1.12