US Class I Rail Process Wiki Engineering: Track, Structures & Signals › Bridges and Structures
🗺 BPMN Process Flow
RR-06-05-02 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-06-05-02
Domain FamilyOPERATIONS
L1 DomainEngineering: Track, Structures & Signals
L2 Process GroupBridges and Structures
TriggerScheduled maintenance or unexpected defects detected through routine inspections or system alerts.
OutcomeSafe and compliant operation of bridges and structures, ensuring no derailments or failures occur due to structural issues.
SystemsNetControl Wabtrax Umler Track geometry car
Regulatory Hooks49 CFR Part 213 49 CFR Part 236, Subpart I GCOR 6.28
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Initial Defect Detection Track Supervisor Wabtrax Routine track inspection data Defect report Detection rate of critical defects above 95% False positives leading to unnecessary inspections Y N
1.2 Prioritize Defects Roadmaster Umler Defect report Prioritized defect list Time to prioritize defects below 4 hours Overlooking critical defects due to high volume Y Y
1.3 Schedule Inspection Crew Track Supervisor NetControl Prioritized defect list Inspection crew schedule Crew availability rate above 90% Inadequate crew scheduling leading to delays Y N
1.4 Conduct On-Site Inspection Assistant Foreman (track) Track geometry car Inspection crew schedule On-site inspection report Inspection accuracy rate above 98% Inaccurate measurements affecting repair decisions Y Y
1.5 Evaluate Inspection Results Roadmaster Umler On-site inspection report Inspection evaluation report Evaluation time below 24 hours Delayed evaluations impacting repair timelines Y N
1.6 Plan Repairs Chief Engineer / VP Engineering Umler Inspection evaluation report Repair plan Repair plan development time below 48 hours Inefficient planning leading to extended downtimes Y Y
1.7 Schedule Repair Crew Track Supervisor NetControl Repair plan Repair crew schedule Crew availability rate above 90% Inadequate crew scheduling leading to delays Y N
1.8 Conduct Repairs Assistant Foreman (track) NetControl Repair crew schedule Repair completion report Repair completion rate above 95% Substandard repairs affecting safety Y Y
1.9 Post-Repair Inspection Assistant Foreman (track) Track geometry car Repair completion report Post-repair inspection report Inspection accuracy rate above 98% Inaccurate measurements affecting safety Y N
1.10 Evaluate Post-Repair Inspection Roadmaster Umler Post-repair inspection report Evaluation report Evaluation time below 24 hours Delayed evaluations impacting operational readiness Y Y
1.11 Update Maintenance Records Track Supervisor Umler Evaluation report Updated maintenance records Record update time below 24 hours Inaccurate record-keeping affecting future planning N N
1.12 Notify Stakeholders Track Supervisor NetControl Updated maintenance records Stakeholder notification Notification time below 48 hours Delayed notifications impacting operational planning N Y
📊 KPIs & Risk Register

KPIs

Detection rate of critical defects above 95% Time to prioritize defects below 4 hours Crew availability rate above 90% Inspection accuracy rate above 98% Evaluation time below 24 hours Repair plan development time below 48 hours Repair completion rate above 95% Record update time below 24 hours Notification time below 48 hours

Key Risks

Structural failure due to inadequate inspections Safety hazards from delayed repairs Operational disruptions from extended downtimes Inaccurate repair work leading to further issues Non-compliance with regulatory standards

Swim Lanes

Track Supervisor · 1.1, 1.3, 1.6, 1.7, 1.11 Roadmaster · 1.2, 1.5, 1.10 Assistant Foreman (track) · 1.4, 1.8, 1.9 Chief Engineer / VP Engineering · 1.6